Stock & lead times

What is in stock, and how fast it reaches you

Our sister company Al Hakim holds more than ten million dollars of valves and piping materials in Dubai. This page explains what that covers, how long delivery to Pakistan takes, and what to expect when an item has to come from the factory.

Ex-stock in Dubai

Al Hakim Flow Control Valves LLC runs three warehouses in Dubai with over 100,000 valves and a matching range of flanges, fittings, gaskets and bolting. The stock is built around the sizes, classes and materials that Gulf and Pakistani plants order most, so a typical maintenance or turnaround list can be confirmed from stock line by line.

Product lineTypically ex-stockUsually factory
Gate valvesAPI 600, 2"–24", Class 150–900, WCB, LCC, WC6, CF8MAbove 24", Class 1500–2500, alloy and duplex bodies
Globe valvesBS 1873, 2"–12", Class 150–600, WCB, WC6, CF8MY-pattern, bellows seal, Class 900+
Check valvesSwing and dual plate, 2"–24", Class 150–600Tilting disc, nozzle check, Class 900+
Ball valvesFloating and trunnion, ½"–16", Class 150–600, WCB, LCC, CF8M, fire-safeLarge bore, Class 900+, cryogenic, metal seated, NACE special trims
Butterfly valvesResilient seated and double offset, 2"–24", wafer and lugTriple offset, double flanged above 24", AWWA
Forged steel valvesAPI 602 Class 800, ½"–2", A105 and F316, SW and NPTClass 1500–2500, F11/F22/F91, bellows seal, extended body
Instrumentation valves316 needle valves, 2/3/5-valve manifolds, DBB, 6,000 psiDuplex and alloy bodies, 10,000 psi+, monoflanges to drawing
Actuated valvesRotork and Auma actuators, pneumatic actuators; assembled in days on stock valvesSIL-certified ESD packages, hydraulic and gas-over-oil actuators
Pipes & tubesAPI 5L / A106 Gr B seamless, ½"–12", Sch 40–160; A312 TP316LLarge diameter, alloy grades, PSL2 project quantities
Pipe fittingsB16.9 WPB and WP316L, ½"–12"; B16.11 A105 and F316 Class 3000Alloy grades, large diameter, Class 6000 and 9000
FlangesB16.5 WN, SO, BL, ½"–24", Class 150–900, A105, F316L; RTJ Class 900–1500B16.47, alloy and duplex, Class 2500
GasketsSpiral wound 316/graphite ½"–24", RTJ R rings, CNAF sheetKammprofile to drawing, large diameter, exotic materials
Stud boltsA193 B7 / A194 2H, ½"–1½", PTFE coated and plainB7M, L7, B16, B8M Class 2, large diameters, metric

Stock moves daily. Send your list on WhatsApp and we confirm availability per line, usually within the hour during working hours.

Delivery to Pakistan

  • Order to dispatch: stock items are picked, inspected, documented and packed in Dubai within two to five working days of order confirmation. Modification or actuation adds the workshop time quoted.
  • Air freight: Dubai to Karachi in two to three days door to door for urgent and small consignments. Lahore and Islamabad are served via Karachi or direct flights.
  • Sea freight: Jebel Ali to Karachi in about two weeks, for heavy and large consignments; LCL for part loads, FCL for project quantities.
  • Customs and delivery: AM Enterprises clears customs in Karachi and delivers to site anywhere in Pakistan, with local PKR or USD invoicing. Allow three to five working days for clearance and inland transport.

Put together, an urgent stock item ordered on a Monday is normally at a Karachi site within the same week, and at a Punjab plant the following week.

Factory lead times

When an item is not in stock we quote it from the manufacturer with the lead time stated per line. Typical ranges, which we confirm at quotation:

  • Cast gate, globe and check valves, standard grades: 8–14 weeks
  • API 6D trunnion ball valves, Class 150–600: 10–16 weeks; Class 900+ and large bore: 16–24 weeks
  • Forged API 602 valves, alloy grades: 6–10 weeks
  • Triple-offset butterfly valves: 10–16 weeks; large double-flanged water valves: 12–20 weeks
  • Actuated packages: valve lead time plus 2–4 weeks for actuator supply and assembly
  • Cryogenic, bellows-seal, urea-grade and exotic-alloy valves: 14–24 weeks
  • Pipe, fittings and flanges, mill orders: 6–12 weeks

Where the specified item is long-delivery, we say so in the quotation and offer a stock alternative with the same standard and rating wherever one exists, so you can decide early.

Urgent and shutdown orders

Mark the enquiry as urgent and give the date the plant needs the item on site. We check Dubai stock first, then the manufacturers' regional stocks, and quote the fastest route with the freight option priced. For planned turnarounds, send the tag list four to eight weeks ahead and we reserve stock against it.